A Lifetime of Projects

  • Fred Smith is the Principal of Smith Associates, a sole proprietorship he founded in 1994 to provide contract services in industrial project development and execution.
  • Throughout his career, Fred has excelled in roles of increasing responsibility from Field Engineer and Senior Cost Engineer to Project Manager, Technical Services Manager, Construction Manager, Site Manager, Area Manager, EPC Project Director and company President.
  • Levering Fred’s depth of technical, contractual, and executive experience, Smith Associates has helped owners, engineers, and contractors obtain business, turn around problem situations, build cohesive and driven teams, focus on results, and maximize profits.

Succeeding in Tough Markets

  • Fred has frequently taken projects from opportunity identification through proposal preparation and client presentations and on to management and execution of the work. 
  • He knows how to cultivate and nourish client relations, develop opportunities, scope out work, estimate costs, present winning proposals, execute the work, and grow profitable businesses—and thrives in the challenges of succeeding in tough markets.

Expertise

  • International business development
  • Management consulting
  • Project and company turnarounds
  • Risk mitigation
  • Strategic planning and alliance development
  • Financial modeling and project financing
  • Capital cost estimating
  • Project Development and project management
  • Team development
  • Construction management
  • Gas turbine and reciprocating engine technology
  • Power generation
  • Cogeneration and trigeneration economics

Power Generation

Fred Smith, the Principal of Smith Associates, has more than 30 years of experience in the development, engineering, procurement,  construction, project management and overhaul/maintenance of power, cogeneration, and trigeneration plants. Locations have  ranged from the Patagonian Desert in Argentina to the Arctic Circle in Canada, and plants have included new and used reciprocating  engine, combustion turbine, and steam turbine drivers, packaged cogeneration plants, and hydroelectric plants. 

He was involved in installing the first production units of three significant combustion turbine generator models: the Westinghouse W251B12 ECONOPAC GTG, the S&S GE LM6000 GTG, and the Rolls-Royce Trent Econopac GTG, and one of the earlier large Innovative Steam  Technologies OTSGs. 

Smith has published articles on cogeneration economics, risk management, and privatization in trade magazines and juried journals,  made numerous presentations at technical and management conferences, and developed a series of spreadsheet models to  effectively evaluate cogeneration economics. 

Echo Bay Mines Power Plant Expansion 

Echo Bay Mines Lupin gold mine in Canada’s Northwest Territories 95 km south of the Arctic  Circle was only accessible by air, or by ice road for ~6 weeks in the winter. 

Building steel and two used 3,300 hp GM diesel-fueled recip engines from a BC mine were  brought in by ice road and reconditioned at site. Extreme winter weather forced a three month summer construction window for heavy concrete foundations of site-batched  concrete and closing-in of the steel building. 

The expansion of the power plant provided additional electrical capacity for a new 1,200 hp  hoist, and hot water heating for the personnel accommodation at site.

Boise Cascade Pulp and Paper Mill Combined Cycle Cogeneration 

New 70 MW combined cycle cogeneration plant at the Boise Cascade Fort Frances pulp and  paper mill on the Rainy River in Ontario, Canada. 

Congested construction site with heavy lifts by a Manitowoc Ringer crane. Tie-ins to an  operating pulp mill. The first production unit of the Westinghouse W251B12 ECONOPAC  gas turbine generator (packaged in Hamilton, Ontario), a Foster Wheeler HRSG with duct  firing and bypass stack, a Westinghouse STG, and package boiler for backup steam.  

Contractual issues with cost-plus and shared saving approach were cited in “Bucking the  Trend: Cost-Plus Services in a Lump-Sum Turnkey Market,” Journal of Management in  Engineering, ASCE, New York, NY, 1996, by H. Fred Smith. 

Ottawa Health Sciences 68 MW Combined Cycle Trigeneration Plant

TransAlta Energy installed the first production unit of the Stewart & Stevenson GE LM6000 aeroderivative gas turbine generator at the Ottawa Health Sciences Centre in Ontario. The Centre includes the Children’s Hospital of Eastern Ontario, Ottawa General Hospital, Ottawa Children’s Treatment Centre, the University of Ottawa, and the Royal Ottawa Health Care Group. The facility also supplies steam to the National Defense Medical Centre and the Rideau Veterans Health Centre. The trigeneration plant includes a 3-pressure Foster Wheeler HRSG with duct burner, a Recoflo short bed demineralization system, an absorption chiller, and an ABB VAX two-speed extraction steam turbine generator.
The plant was Alberta-based TransAlta Energy’s first IPP plant and its first foray into the province of Ontario. It supplied 68 MW of electricity to the provincial grid, and steam, hot water, and chilled water to the members of the Health Sciences Centre.

Atlantic Packaging 58 MW Cogeneration Plant

The Whitby Cogeneration Limited Partnership developed a 58 MW cogeneration plant that used the first production unit of the Rolls-Royce Trent-ECONOPAC gas turbine generator.  Gas turbine exhaust gas was directed through an Innovative Steam Technologies (IST) Once Through Heat Recovery Steam Generator (OTSG).  High pressure steam was supplied to Atlantic Packaging’s recycled paper products mill in Whitby, Ontario, and electricity was sold to the provincial grid.

Piedra del Aguila 1400 MW Hydroelectric Plant

Technical and Takeover team leadership for the due diligence evaluation, successful bid preparation and takeover of the 1,400 MW Piedra del Aguila hydroelectric plant in Argentina (Patagonian Desert) as part of an international utility consortium of TransAlta Energy, Duke Energy, and Chilgener S.A.  Total installed cost exceeded $1.2 billion.  The Piedra del Aguila plant was the largest electrical facility in Argentina and supplied 10% of the country’s electricity.  It was part of an extensive privatization of public facilities undertaken by the Argentinian government.

A number of articles were published by Smith regarding the privatization:

 “Privatization in Patagonia: the Selling of Argentina’s Largest Hydroelectric Plant,” Proceedings of PMI’94 25th Annual Seminar/Symposium, Vancouver, October 17-20, 1994, Project Management Institute, Newtown Square, PA. 1994.  This article is also included in Chapter 3 “Motivating,” Project Management Casebook, Edited by Dr. David I Cleland, University of Pittsburg, et al, PMI Publications, 1997.  “Privatizing Works Under Construction – Reining-In the Risks,” Concepts for the Future, US Department of Energy and HCI Publications, Kansas City, MO, 1994 (this chapter was the winner of 1994 HydroVision Award).

Hurricane Hydrocarbons Flare Gas 55 MW Simple Cycle Power Station, Kazakhstan

Hurricane Hydrocarbons, a Canadian oil and gas company, had been directed to reduce flaring in its oilfields in Kumkol, Kazakhstan.  Apex Cogen conducted a FEED study and recommended acquisition of used industrial gas turbine generators to consume the flare gas and generate power for Hurricane’s Kumkol oilfields and other grid—connected facilities. 

Apex sourced and acquired three packaged GE Frame 5 GTGs in former East Germany, supervised inspection, upgrading, and relocation to Kazakhstan, and provided detailed engineering and installation supervision for the power island, including 10.5 kV to 220 kV substation. 

Turbine blade damage was discovered during inspection by Apex Cogen and repaired by the Seller.  Upgrades included water injection for NOx reduction, new PLC-based controls system, air filtration system, MCCs. 

Chickadee Creek Energy Biomass Gasification Plant

Chickadee Creek Energy proposed a new Biomass Gasification and 22 MW combined cycle cogeneration plant for the Millar Western BCTMP mill in Whitecourt, Alberta.  The plant would collect, dry, and gasify hog fuel from several sawmill sources, and combust the biomass gas in a 15 MW GTG with steam turbine generator.

FEED and capital cost estimate for the gasification plant including hog fuel storage, drying, and handling, syngas production using the patented Taylor Biomass gasification technology, power production using a modified Solar GTG and condensing extraction STG with cogeneration.  TIC=$180 million.

Services

Marketing and Strategic Planning

  • Marketing plans and consultative sales for engineering, procurement and construction services (EPC and EPCM)
  • Strength-driven marketing plans and focus of message and media
  • Organization and management of complex proposals including execution plans involving multinational teams
  • Presentation design and preparation including strategy, PowerPoint materials, team rehearsals, and delivery.

Contracts and Commercial Support

  • Drafting complex contracts for collaboration, confidentiality, non-circumvention, and teaming as well as for execution of engineering, procurement, fabrication, construction, long term service and maintenance agreements
  • Contract negotiations
  • International insurance, export, documentary letters of credit
  • Commercial reviews and tender exceptions and qualifications
  • Working with legal counsel on contract preparation, qualifications, payment, collection, and claims
  • Schedule analysis including CPM
  • Claims prevention, preparation and negotiation

Subject Matter Expertise – Cogeneration

  • gas turbines, steam turbines, reciprocating engines and heat recovery
  • financial modeling of cogeneration savings
  • cogeneration and trigeneration equipment sizing and selection
  • arrangement of project financing,